We were able to get a few more items checked off the list for today.
First, we got the ADA handicap parking space painted:
Second, we have widened the doorway of the FabLab so that we can move the lasers in without tipping them on their side or end:
The plan is to replace the original 36 inch door once the lasers are in place. The section of wall that we took out will be replaced with a stud wall. That way, if we ever decide to purchase another laser, or if we have reason to need a wide doorway to move something in or out, we will be able to easily remove the door and stud wall.
Thanks to everyone who helped out today!