This week at MakeICT 11.16.20

CALL FOR HELP! We are soooo close to C.O. Here are the things we need help with,
this week at MakeICT:

  1. FINSH PLUMBING LOOSE ENDS
  • Men’s Bathroom South Hall
    a. caulk around bottom of new ADA stool
    b. replace spud in power flush 1” toilet
    c. repair middle urinal flush valve to shut off
    d. repair low urinal east to seal to wall correctly.

  • Women’s Bathroom South Hall
    a. caulk around base of new ADA toilet

  • New ADA bathroom
    a. caulk around base of new ADA toilet
    b. caulk around drain pipe penetration into floor
    c. wrap pipes

  • Ceramics
    a. Continue vent pipe from ceramics sink to be 12” above roof line where it abuts roof
    b. Connect ceramics sink to drain line

  • Kiln Room
    a. Rework drain line for kiln room sink: inlet higher than outlet

  • Screen Print
    a. Connect wash tub to drain.

  1. ADD NEW PULLIES TO BARN DOORS
  2. HANG RESTROOM SIGNAGE
  3. WASH, PRIME AND PAINT WEST HALL
  4. ORGANIZE ACRYLIC IN GARAGE.
  5. FINISH CLEANING RESTROOMS.
    a. clean, buff or strip floors.
    b… Re seal (2 coats) and apply shine
  6. VACUUM LEAVES FROM CARPET
  7. CONTINUE WORK ON BOOKCASES
  8. TEXTILES FOLD FABRIC
  9. SCRAPE WINDOWS
  10. FIX GUTTERING ON NORTH SIDE