Facilities Accomplishments 3-24-2026
The toilet in the Women’s restroom Eastern most stall is repaired, functional and cleaned.
The hygiene products hampers have been attached to the walls in each stall, we will attach them in the two ADA restrooms next week.
The accumulated trash has been removed from the Aluminum Can Recycling Receptacle in the South Hall.
The paper towels have been restocked in the Janitors closet.
A spray bottle of sanitizer has been hung in the Men’s and Women’s restroom.
We investigated the stain on the East side of the entrance to Fab Lab, it does not appear to be liquid as reported. The gray metal in the hole is the remnant of a lag shield and the pinkish stain is dried epoxy. No further action was taken though painting over it may be a future project.
Jim began moving conduit and assorted junk out of the SouthEast corner of the boiler room to create the new castle storage.
Next week:
Re-covering the fabric table in Textiles (probably)
Continuing to hang Hygiene Receptacles (4 left)
Continuing to hang spray bottles of sanitizer (6 left)
Welcoming any new Facilities committee members that may join us and basking in the warmth of our regular crew, many snide comments will be made in jest.